New wind turbine transport system from Huisman

04 June 2021

Schiedam, Netherlands-based heavy construction equipment designer and manufacturer Huisman has launched a wind turbine component feeder vessel with a Motion Compensated Platform.

It is designed to quickly and safely transfer wind turbine components from a feeder vessel. It complies with the USA’s Jones Act enabling the safe transportation and lifting of turbine components in USA waters.  

Read more about wind power transportation in the June issue of ICST, out 14th June.
Read more about wind turbine erection in the July issie of ICST, out 12th July

STAY CONNECTED



Receive the information you need when you need it through our world-leading magazines, newsletters and daily briefings.

Sign up

POWER SOURCING GUIDE

The trusted reference and buyer’s guide for 83 years

The original “desktop search engine,” guiding nearly 10,000 users in more than 90 countries it is the primary reference for specifications and details on all the components that go into engine systems.

Visit Now

CONNECT WITH THE TEAM
Becky Schultz Vice President of Content Tel: +1 480 408 9774 E-mail: [email protected]
Julian Buckley Editor Tel: +44 (0) 1892 784088 E-mail: [email protected]
Chad Elmore Managing Editor Tel: +1 262 754 4114 E-mail: [email protected]
Josh Kunz Power Progress Brand Manager Tel: +1 414 379 2672 E-mail: [email protected]
Roberta Prandi Power Progress International Brand Manager Tel: +39 334 6538183 E-mail: [email protected]
Simon Kelly Sales Manager Tel: +44 (0) 1892 786 223 E-mail: [email protected]
CONNECT WITH SOCIAL MEDIA